ÖÐÎÄ
  • Home
  • About us
    • Company profile
    • Speech by chairman
    • Core team
    • Development roadmap
    • Enterprise culture
  • Technology
    • Flywheel KERS >
      • Brief introduction
      • Milestone
      • Current status of R&D
    • Our products
    • Core technology
  • Industry updates
  • Careers
  • Download
  • Contact us
  • Company profileSpeech by chairmanCore teamDevelopment goalsEnterprise culture
  • Development roadmap
     

    Phase 1: R&D (2012)
    Step 1:
    Integration and debugging for principle of prototype;
    Demonstration for the theory of foundation to ¡°electrical type¡± flywheel KERS;
    Functional prototype development launched.
    Step2:
    Implementing full development procedure on functional prototype from design, integration to testing;
    A joint development contract with an OEM upon clean energy vehicle installed with flywheel KERS achieved;
    A lab equipped with test rig built up;
    A full function of R&D team involving design, system control and testing initially formed;
    A portfolio of patents including 10 patents for invention and 20 patents for utility model (design) are applied and a comprehensive IP system in flywheel KERS founded.

     

    Phase 2: Industrialization (2013-2014)
    Step 1:
    The joint development in clean energy vehicle installed with flywheel KERS with an OEM achieved in 4-6 months;
    The 1st clean energy vehicle installed with ¡°electrical type¡± flywheel KERS in the world launched after series of matching experiment in CBU, road testing and certificated by relevant state authority;
    Batches of order from the OEM delivered and it should be a milestone for industrialization of ¡°electrical type¡± flywheel KERS;
    The development project of ¡°electrical type¡± flywheel KERS approved by Ministry of Science and Technology in China as state incentive project in National clean energy technology program.
    Step 2: A pilot product line with 10,000 units of annual output constructed and a certificated quality assurance system implemented in 6-8 months;
    A full function development system and well- equipped lab built up.

    Phase 3: Mass production (2015-2016)
    Development targets:
    A perfect R&D system formed, JIT management system implemented effectively, a quick response and big coverage service system in operation;
    Sophisticated supply chain formed;
    Multinational operation and capital operation internationally.
    Revenue targets:
    10,000 units of product sold in 2015 and USD50M annual revenue achieved;
    100,000 units of product sold in 2016 and USD500M annual revenue achieved.

    Phase 4: Leapfrog development (2017-2020)
    1 million annual output capacity, USD 5 billion revenue and 20% market share in China achieved by 2020 and HAIKE as a world class multinational enterprise formed;
    Shaped as the 1st world class T1 in vehicle powertrain derived from Chinese corporations in auto industry depending on its core & global competitiveness and full IP system.

    Home : About us>Development roadmap
© 2012 CHANGZHOU HAIKE NEW ENERGY TECH CO., LTD. All rights reserved.